InfrastructureTikrit – Baiji Highway Rehabilitation
Full-depth rehabilitation and widening of a 38 km strategic highway corridor, including drainage, signage and safety barriers.
Portfolio
A selection of the construction, infrastructure and engineering work delivered by AUC.
InfrastructureFull-depth rehabilitation and widening of a 38 km strategic highway corridor, including drainage, signage and safety barriers.
ConstructionDesign and construction of a three-storey administrative headquarters with stone facade, MEP fit-out and external works.
Oil & GasCivil and mechanical support works for a producing oil field, including pipeline routing, tank foundations and access roads.
ConstructionConstruction of an 18-classroom primary school with administration block, shaded courtyard and services connections.
LogisticsMulti-year transportation and logistics programme moving heavy plant, containers and project cargo across central Iraq.
EngineeringEngineering, supply and installation of a water treatment and pumping station serving 1,200 hectares of irrigated farmland.
Speak with AUC about your construction, engineering, logistics or general trading requirements.